Feasibility Studies

Pre-FEED and FEED-level assessments that translate CCUS ambition into bankable projects β€” site-specific techno-economic modelling, storage geology evaluation, COβ‚‚ transport routing, and financial viability analysis for Indian industrial sites.

The Service

From Concept to Bankable Project β€” Rigorous, India-Specific Feasibility

Pre-FEED through FEED. Every site parameter accounted for.

A CCUS feasibility study is the most consequential document an industrial company will produce in its decarbonisation journey. It determines whether a project proceeds to financial investment decision, what technology is selected, which storage formation is used, how the COβ‚‚ transport network is configured, and what the cost per tonne captured will be. Done poorly, it produces a number that cannot survive lender scrutiny. Done well, it becomes the foundation for a bankable, permittable, and financeable project.

NCM's feasibility studies are designed to the standard required by development finance institutions β€” World Bank / IFC, ADB, and EIB β€” and the Indian lender community. Our teams have led or reviewed feasibility studies for CCUS projects at Gorgon (Australia), Net Zero Teesside (UK), and Porthos (Netherlands), and apply the same rigour to Indian steel mills, cement plants, coal power stations, and chemical complexes.

We scope every study to the site β€” accounting for flue gas composition, capture technology fit, water balance, COβ‚‚ purity requirements, transport corridor options, and storage formation characteristics specific to Indian geology. Our studies are not desktop exercises: they involve field visits, laboratory analysis where required, and direct engagement with India's geological survey data.

Concept & Pre-Feasibility (Pre-FEED)
Capture potential quantification, technology options screening, storage corridor identification, order-of-magnitude cost estimate (Β±40%), and go/no-go recommendation β€” 8–12 weeks.
Preliminary Feasibility (Pre-FEED+)
Technology selection, process design basis, site layout, storage appraisal, COβ‚‚ transport routing, Class 4 cost estimate (Β±25%), project schedule, and lender information memorandum β€” 16–24 weeks.
FEED-Level Feasibility
Full process engineering, P&IDs, equipment specifications, HAZOP, Class 2 cost estimate (Β±10%), financial model for DFI submission, and FID-ready project documentation β€” 9–18 months.
Techno-Economic Modelling
Full lifecycle cost of capture, transport, and storage per tonne COβ‚‚; sensitivity analysis against carbon price, energy cost, capex; IRR and NPV under multiple DFI financing scenarios.
Sector Coverage

Feasibility Studies Across India's Hard-to-Abate Sectors

NCM conducts feasibility studies across all major industrial emission sources in India. Steel sector studies must account for blast furnace gas composition, direct reduction iron (DRI) integration, and India's unique coal-based DRI dominance β€” very different from the natural gas-based DRI prevalent in the Middle East or the integrated blast furnace steel of Europe.

Cement feasibility work addresses the process-specific COβ‚‚ from calcination (which cannot be avoided by fuel switching), the high concentration of COβ‚‚ in cement flue gas which improves capture economics, and India's exceptionally high cement production growth trajectory. Coal power assessments must navigate the tension between India's energy security imperatives and its decarbonisation commitments β€” identifying which plants are economically viable for retrofit versus retirement.

For chemicals and fertiliser complexes β€” ONGC, IOCL, RIL, GNFC, Rashtriya Chemicals β€” NCM feasibility work integrates CCUS with hydrogen production pathways, COβ‚‚ utilisation for urea synthesis, and the specific regulatory requirements of India's petrochemical licensing regime.

🏭
Steel & Metals
BF-BOF, DRI-EAF, sinter plant capture
🧱
Cement
Kiln exhaust, calcination COβ‚‚ capture
⚑
Coal Power
Post-combustion PCC, IGCC pre-combustion
πŸ§ͺ
Chemicals & Fertilisers
Ammonia, urea, methanol, SMR hydrogen
Australian Precedent

Lessons from the World's Most Advanced CCUS Feasibility Studies

πŸ‡¦πŸ‡Ί

Gorgon Project β€” $54B Lesson

Australia's Gorgon CCUS project taught the industry that feasibility studies must account for subsurface injection variability, water disposal, and well integrity over decades. NCM applies these hard-won lessons to Indian onshore and offshore storage appraisals.

πŸ‡¬πŸ‡§

Net Zero Teesside β€” Cluster Approach

Teesside's multi-emitter shared infrastructure model β€” reducing cost per tonne through shared COβ‚‚ transport and storage β€” directly informs NCM's approach to India's industrial cluster feasibility work in Odisha, Jharkhand, and Gujarat.

πŸ‡³πŸ‡±

Porthos Rotterdam β€” Shared Storage

Porthos' Rotterdam port cluster demonstrated how shared offshore storage infrastructure can reduce the LCOC for individual emitters by 40–60%. NCM uses this model to evaluate shared COβ‚‚ infrastructure corridors for India's coastal industrial zones.

What You Receive

Deliverables Designed for Lenders, Boards, and Regulators

NCM feasibility deliverables are structured to serve multiple audiences simultaneously. The Technical Report provides the engineering basis, geological assessment, and process design for technology specialists and government reviewers. The Financial Model provides the lender-grade cost structure, sensitivity analysis, and financing scenarios required for DFI submissions to IFC, ADB, and EIB. The Executive Summary is board-ready β€” a 20-page document that presents findings, options, and recommendations with the clarity required for investment committee decisions.

All feasibility studies are delivered with a Regulatory Pathway Document that maps the environmental clearances, storage permits, and CBAM documentation requirements associated with the recommended project β€” ensuring that regulatory risk is understood and managed from day one, not discovered at the point of permitting.

  • Technical Report β€” engineering basis, process design, storage geology, COβ‚‚ transport routing
  • Financial Model β€” LCOC, NPV/IRR, DFI financing scenarios, carbon price sensitivity
  • Executive Summary β€” board-ready 20-page investment decision document
  • Regulatory Pathway β€” clearance requirements, permitting timeline, CBAM documentation map
  • Lender Information Memorandum β€” structured for IFC, ADB, EIB, and Indian bank submission
  • Risk Register β€” technical, commercial, regulatory, and social risks with mitigation strategies